PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/17/25 EST. NO. 001 TIME 04:16 PM R.E. NAME: ALEX BALCE 11-2N2344 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/17/25 EST. NO. 001 TIME 04:16 PM R.E. NAME: ALEX BALCE 11-2N2344 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2344 TIME 04:16 PM ESTIMATE NO. 001 BID OPENING 04/16/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 07/17/25 LOCATION PROGRESS ESTIMATE 11-SD-15-0.4/T2.8 ----------------- HAZARD CONSTRUCTION ENGR, LLC SAN DIEGO COUNTY IN SAN DIEGO FROM MAIN 10529 VINE STREET STREET UNDERCROSSING TO 0.6 MILE NORTH OF LAKESIDE CA 92040 ROUTE 15/94 SEPARATION FED. AID NO. N O N E COLD PLANE AC, RHMA-G OVERLAY, PAVEMENT MA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 2,000.0000 180,000.00 10.000 20,000.00 10.000 20,000 003 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.444 11,100.00 0.444 11,100 004 TRAFFIC CONTROL SYSTEM LS 148,000.0000 148,000.00 0.111 16,428.00 0.111 16,428 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,000.0000 90,000.00 10.000 10,000.00 10.000 10,000 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 100.0000 9,000.00 10.000 1,000.00 10.000 1,000 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3,000.0000 18,000.00 0.667 2,001.00 0.667 2,001 008 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.111 1,110.00 0.111 1,110 009 WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 0.111 222.00 0.111 222 010 MANAGE SOLID WASTE GENERATED BY THE HR 250.0000 18,000.00 0.000 0 PUBLIC 011 SHOULDER BACKING TON 50.0000 42,000.00 0.000 0 012 ASPHALTIC EMULSION (FOG SEAL COAT) TON 500.0000 6,000.00 0.000 0 013 HOT MIX ASPHALT (TYPE A) TON 250.0000 5,250.00 21.000 5,250.00 21.000 5,250 014 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 160.0000 977,600.00 4,800.000 768,000.00 4,800.000 768,000 015 DATA CORE LS 1,500.0000 1,500.00 0.000 0 016 TACK COAT TON 500.0000 8,000.00 12.500 6,250.00 12.500 6,250 017 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.0000 249,840.00 49,068.000 196,272.00 49,068.000 196,272 018 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 5,952.00 0.000 0 019 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 5.5000 4,400.00 0.000 0 WET NIGHT VISIBILITY) 020 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 33,840.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 021 12" THERMOPLASTIC TRAFFIC STRIPE LF 3.1000 21,985.20 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 022 6" RUMBLE STRIP (ASPHALT CONCRETE STA 65.0000 325.00 0.000 0 PAVEMENT) PROGRAM CAS145 PAGE 2 DATE 07/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2344 TIME 04:16 PM ESTIMATE NO. 001 BID OPENING 04/16/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 07/17/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 12" RUMBLE STRIP (ASPHALT CONCRETE STA 65.0000 22,880.00 0.000 0 PAVEMENT) 024 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 21,080.00 0.000 0 (WARRANTY) (BROKEN 12-3) 025 CONTRAST STRIPE PAINT (2-COAT) LF 0.5000 3,546.00 0.000 0 026 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.3000 3,289.50 0.000 0 (WARRANTY) (BROKEN 17-7) 027 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 99,552.00 0.000 0 (WARRANTY) (BROKEN 36-12) 028 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 18.0000 17,460.00 0.000 0 (WARRANTY) 029 MODIFYING EXISTING ELECTRICAL SERVICE LS 12,000.0000 12,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2344 TIME 04:16 PM ESTIMATE NO. 001 BID OPENING 04/16/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 07/17/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,039,133.00 1,039,133.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,039,133.00 1,039,133.00 030 MOBILIZATION LS 225,000.0000 225,000.00 0.950 213,750.00 0.950 213,750 ORIGINAL CONTRACT AMOUNT 2,262,999.70 TOTAL WORK COMPLETED 1,252,883.00 1,252,883.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,252,883.00 1,252,883.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/25 90 07/07/25 07/07/25 11/12/25 10 0 0 0 55% 11% PROGRESS IS SATISFACTORY ALEX BALCE RESIDENT ENGINEER