PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/17/13 EST. NO.06 TIME 01:14 PM R.E. NAME: MERKWAN, KRYSTAL 12-0M1404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/17/13 EST. NO.06 TIME 01:14 PM R.E. NAME: MERKWAN, KRYSTAL 12-0M1404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION E NOR -3,000.00 03 E NOR 3,000.00 04 MSL DILING C/P -1,000.00 04 RET. MSL PILING 1,000.00 05 ROBERTS CONCRETE CUT -2,425.00 05 ROBERTS CONCRETE CUT 2,425.00 06 2,425.00 0.00 TOTAL DEDUCTIONS 2,425.00 0.00 PROGRAM CAS145 PAGE 1 DATE 10/17/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M1404 TIME 01:14 PM ESTIMATE NO. 06 BID OPENING 05/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/19/13 R.E. NAME: MERKWAN, KRYSTAL DATE OF THIS ESTIMATE 10/17/13 LOCATION FINAL ESTIMATE 12-ORA-405-0.3/7.8 -------------- V A P CONSTRUCTION INC IN ORANGE COUNTY IN IRVINE AT 16425 ILLUSION WAY VARIOUS LOCATIONS FROM IRVINE CTR LA MIRADA CA 90638 DRIVE OC TO MACARTHUR BLVD OC FED. AID NO. N O N E ADA UPGRADES. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 1,088.0000 1,088.00 1.000 1,088 002 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 1.000 1,500 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 75.0000 750.00 10.000 750 004 CONSTRUCTION AREA SIGNS LS 21,000.0000 21,000.00 1.000 21,000 005 TRAFFIC CONTROL SYSTEM LS 37,500.0000 37,500.00 1.000 37,500 006 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 1.000 3,000 007 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 820.00 458.000 916 008 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.2500 3,262.50 1,053.000 2,369 009 REMOVE PAVEMENT MARKER EA 2.0000 80.00 34.000 68 010 REMOVE ROADSIDE SIGN EA 75.0000 150.00 2.000 150 (STRAP AND SADDLE BRACKET METHOD) 011 REMOVE ROADSIDE SIGN PANEL EA 50.0000 2,550.00 25.000 1,250 012 REMOVE CONCRETE CY 200.0000 24,000.00 165.500 33,100 013 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000 014 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 015 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.5000 6,250.00 684.000 8,550 (0.063"-UNFRAMED) 016 ROADSIDE SIGN - ONE POST EA 350.0000 1,400.00 3.000 1,050 017 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 75.0000 150.00 2.000 150 METHOD) 018 INSTALL ROADSIDE SIGN PANEL ON EA 50.0000 4,150.00 83.000 4,150 EXISTING POST 019 MINOR CONCRETE (MISCELLANEOUS CY 385.0000 46,200.00 148.000 56,980 CONSTRUCTION) 020 CURB RAMP DETECTABLE WARNING SURFACE SQFT 75.0000 9,000.00 119.000 8,925 021 4" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 64.00 5,737.000 11,474 022 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.2500 922.50 1,731.000 3,894 PROGRAM CAS145 PAGE 2 DATE 10/17/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M1404 TIME 01:14 PM ESTIMATE NO. 06 BID OPENING 05/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/19/13 R.E. NAME: MERKWAN, KRYSTAL DATE OF THIS ESTIMATE 10/17/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 6,320.00 1,844.000 7,376 024 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 528.00 34.000 408 025 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000 SYSTEM ELEMENTS DURING CONSTRUCTION 026 MODIFY SIGNAL LS 93,500.0000 93,500.00 1.000 93,500 027 MODIFY SIGNAL AND LIGHTING LS 25,000.0000 25,000.00 1.000 25,000 PROGRAM CAS145 PAGE 3 DATE 10/17/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M1404 TIME 01:14 PM ESTIMATE NO. 06 BID OPENING 05/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/19/13 R.E. NAME: MERKWAN, KRYSTAL DATE OF THIS ESTIMATE 10/17/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 332,649.00 ADJUSTMENT OF COMPENSATION 0.00 25,400.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 0.00 358,049.00 ORIGINAL CONTRACT AMOUNT 297,685.00 TOTAL WORK COMPLETED 0.00 358,049.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 2,425.00 0.00 TOTAL 2,425.00 358,049.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/05/12 35 11/26/12 11/26/12 06/19/13 35 106 0 0 100% 100% MERKWAN, KRYSTAL RESIDENT ENGINEER PROGRAM CAS145 DATE 10/17/13