Construction Procedure Directives (CPDs)
List of Eliminated Construction Procedure Directives
Construction procedure directive memorandums are issued to clarify information already contained in the Construction Manual, introduce a process change, remind readers of existing policy, announce a new form, or inform the reader of a change in address or contact.
CPD 19-9 | Speed Limit Reductions in Construction Work Zones | 4/30/2019 | Attachment 1: Director's Memorandum, " Temporary Traffic Control Speed Limit Reduction in Work Zone," dated April 19, 2019 Attachment 2: Sample Form CEM-4903, “Change Order Memorandum” Attachment 3: Sample Form CEM-4900, “Change Order” Attachment 4: FHWA “Record of Blanket Prior Approval for Major Contract Change Order” |
CPD 19-8 | Hamburg Wheel Track Test for Rubberized Hot Mix Asphalt — Gap Graded | 4/2/2019 | Attachment 1: Sample Form CEM-4903, “Change Order Memorandum” Attachment 2: Sample Form CEM-4900, “Change Order” Attachment 3: Revised Specification for Hamburg Wheel Track Attachment 4: FHWA “Record of Blanket Prior Approval for Major Contract Change Order” |
CPD 19-7 | Modified SB-1 Project Funding Identification S igns | 3/12/2019 | Attachment 1: Sample Form CEM-4903, “Change Order Memorandum” Attachment 2: Sample Form CEM-4900, “Change Order” Attachment 3: C 48 (CA) Project Funding Identification Sign Details Sheet” Attachment 4: FHWA “Record of Blanket Prior Approval for Major Contract Change Order” |
CPD 19-6 | Hot Mix Asphalt Pavement Smoothness | 3/4/2019 | Attachment 1: Sample Form CEM-4903, “Change Order Memorandum” Attachment 2: Sample Form CEM-4900, “Change Order” Attachment 3: FHWA “Record of Blanket Prior Approval for Major Contract Change Order" |
CPD 19-5 | Updated Dispute Resolution Advisor and Dispute Resolution Board Forms | 3/1/2019 | |
CPD 19-4 | Mandatory Safety Meeting Regarding Valley Fever | 1/25/2019 | |
CPD 19-3 | Electronic Transmission of Certified Payroll | 1/25/2019 | |
CPD 19-2 | Safety Documentation on Emergency Contracts | 1/9/2019 | |
CPD 19-1 | Materials on Hand | 1/9/2019 | Attachment 1: Revised Standard Specification Attachment 2: Form CEM-5101, Request for Payment for Materials on Hand Attachment 3: Form CEM-5105, Materials on Hand Summary |
CPD 18-8 | Wildfire Effects on Construction Projects [pdf] |
12/17/2018 |
|
CPD 18-7 | X-Lite Guardrail End Treatment Suspension [pdf] |
8/24/2018 | |
CPD 18-6 | High-Performance Glass Beads [pdf] |
6/13/2018 |
|
CPD 18-5 | Steel Price Increases [pdf] |
6/1/2018 |
|
CPD 18-4 | Thermoplastic Application Rate [pdf] |
6/1/2018 | Attachment 1: CEM-4900, “Change Order” |
CPD 18-3 | ProVAL Smoothness Assurance Module Guide and Training [pdf] |
3/26/2018 |
|
CPD 18-2 | SB-1 Project Funding Identification Signs [pdf] | 3/12/2018 | Attachment 1: Sample CEM-4903, “Change Order Memorandum” |
CPD 18-1 | Permanent Pedestrian Facilities ADA Compliance Handbook [pdf] | 3/6/2018 | |
CPD 17-7 | Permanent Pedestrian Facilities Forms (Non-Standard Plan Curb Ramps) [pdf] | 12/01/2017 | |
CPD 17-6 | Contractor Option to Use Returned Plastic Concrete [pdf] | 09/29/2017 | |
CPD 17-5 | Code of Safe Practices—September 2017 [pdf] | 09/15/2017 | Supersedes CPD 14-2 |
CPD 17-4 | Protection From Exposure to Respirable Crystalline Silica Training [pdf] | 09/08/2017 |
|
CPD 17-3 | Implementation of 6-Inch Traffic Lines and Discontinued Use of Nonreflective Pavement Markers [pdf] | 08/15/2017 | Attachment 1: Sample CEM-4903, “Change Order Memorandum” |
CPD 17-2 | Acceptance Testing Turnaround for Job-Produced Materials [pdf] | 07/25/2017 |
|
CPD 17-1 | Permanent Pedestrian Facilities Inspection Training [pdf] | 07/14/2017 |
|
CPD 16-14 | Reinstatement of SRT Systems and Rescission of Construction Procedure Directive 16-11 [pdf] | 10/31/2016 |
Supersedes CPD 16-11 |
CPD 16-13 | Bridge Deck Crack Prevention [pdf] | 10/11/2016 |
Attachment 2: Sample CEM-4900, “Change Order” Attachment 3: Change Order Attachment—Bridge Deck Crack Prevention Specifications
|
CPD 16-12 | G-12 Funds Request Memorandum [pdf] | 10/07/2016 | |
CPD 16-10 | Americans With Disabilities Act Compliance in Construction [pdf] | 07/26/2016 | |
CPD 16-8 | Hot Mix Asphalt with Reclaimed Asphalt Pavement [pdf] | 06/22/2016 | Attachment 1: Example Blending Charts Attachment 6: Sample Change Order—New JMF Based on Maximum RPBR Attachment 8: New JMF Based on Maximum RPBR, FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order” |
CPD 16-7 | Shortage of Material—Fly Ash [pdf] | 05/24/2016 | |
CPD 16-5 | Rebates for Reducing Water Usage [pdf] | 05/3/2016 | |
CPD 16-4 | Authorization to Proceed for Ordered Extra Work [pdf] |
4/5/2016 |
|
CPD 16-3 | Extra Work Bill Review [pdf] |
4/5/2016 |
|
CPD 16-1 | Bidder Inquiries [pdf] |
1/4/2016 |
|
CPD 15-5 | Water Conservation — Implementation of Caltrans’ 2015 Drought Action Plan Commitments [pdf] |
12/7/2015 | Attachment 1: Sample Change Order Memorandum—Delay Highway Planting Attachment 2: Sample Change Order—Delay Highway Planting Attachment 3: Sample Change Order Memorandum—Delete Highway Planting |
CPD 15-4 | Recycled Water Usage for Landscaping [pdf] | 12/1/2015 | Attachment 1: Sign S28(CA) “USING RECYCLED WATER” details Attachment 2: Sample Change Order Memorandum for Recycled Water Information Signs Attachment 3: Sample Change Order for Recycled Water Information Signs Attachment 4: FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order”
|
CPD 15-3 | Proper Charging for Stormwater Contract Administration Work [pdf] | 5/28/2015 |
|
CPD 15-2 | Final Materials Certification Form [pdf] | 5/26/2015 |
|
CPD 15-1 | Stormwater Program—Construction Compliance Evaluation Plan [pdf] | 3/25/2015 |
|
CPD 14-10 | Suspension of the ET-Plus, ET-Plus 31, ET-2000 Plus, and ET-2000 [pdf] | 11/14/2014 | |
CPD 14-9 | Flagging Instuction Handbook [pdf] | 10/29/2014 |
|
CPD 14-8 | Portable Transverse Rumble Strips [pdf] | 10/29/2014 | |
CPD 14-6 | Guidance for the Work Breakdown Structure and Workplan Standards Guide [pdf] | 07/10/2014 |
|
CPD 14-5 | Construction Resource Estimating Norms [pdf] | 07/10/2014 |
|
CPD 14-4 | Coefficient of Friction Testing on Bridge Deck Methacrylate Resin Treatments and Polyester Concrete Overlays [pdf] | 06/17/2014 | Attachment 1: Sample Change Order Memorandum (Bridge Deck Methacrylate Resin Treatment) |
CPD 14-1 | Water Conservation [pdf] | 03/04/2014 | |
CPD 13-10 | Implementation of Automated Machine Guidance for Ongoing Projects [pdf] | 11/12/2013 | |
CPD 13-9 | Construction Records Retention and Storage [pdf] | 10/24/2013 | |
CPD 13-6 | Local Agency Fees, Permits, and Services [pdf] | 08/05/2013 | |
CPD 13-5 | Contractor Option to use up to 25 Percent Reclaimed Asphalt Pavement in Hot Mix Asphalt [pdf] | 08/02/2013 | |
CPD 13-4 | Hot Mix Asphalt Optimum Bitumen Content Based on Total Weight of the Mix [pdf] | 07/15/2013 | |
CPD 13-3 | Construction Support Planning, Managing, and Charging Practices [pdf] | 06/04/2013 | |
CPD 13-1 | Salvaged or Surplus Material [pdf] | 04/19/2013 | |
CPD 12-2 | Contractor Option for Use of Warm Mix Asphalt Technologies in Hot Mix Asphalt [pdf] | 06/07/2012 | |
CPD11-3 | Use of the California Highway Patrol in Construction Work Zones [pdf] | 08/24/2011 | |
CPD11-2 | Grandfathered Risk Level 1 Projects [pdf] | 07/22/2011 | |
CPD10-12 | Interviews with Contractor Personnel [pdf] | 09/09/2010 | |
CPD10-1 | Small Business Utilization Report Pilot Program Extension [pdf] | 02/25/2010 | |
CPD 09-9 | Charges for Restaking Rate [pdf] | 08/13/2009 | |
CPD 09-3 | Small Business Utilization Report [pdf] | 04/10/2009 | |
CPD 09-2 | Temporary Sales and Use Tax Increase -Assembly Bill 3 (Evans)[pdf] | 04/02/2009 | |
CPD 08-9 | Hot Mix Asphalt Specifications Evaluation [pdf] | 09/29/08 | |
CPD 08-8 | Worker Certification Requirements [pdf] | 09/11/2008 | |
CPD 08-7 | Options for Meeting California Test 371 Requirements for Rubberized Hot Mix Asphalt-Gap Graded [pdf] |
09/18/2008 | |
CPD 08-2 | Pavement Asphalt Concrete Reporting System [pdf] | 06/25/2008 |
Attach 1 SAMPLE: Contract Change Order Memo-Use of AcPay3 [pdf]
Attach 2 SAMPLE: Contract Change Order-Use of AcPay3 [pdf] Attachment 3 SAMPLE: Contract Change Order Memo-Use of HMAPay [pdf] Attachment 4 SAMPLE: Contract Change Order-Use of HMAPay [doc] Attachment 5 FHWA-Record of Blanket Prior Approval for Major Contract Change Order [pdf] |
CPD 08-1 | Day After Thanksgiving - Nonworking Day [pdf] | 02/29/2008 | |
CPD 06-11 | Performance Graded Polymer Modified Asphalt [pdf] | 11/21/2006 | Attachment 1 [pdf] Attachment 2 [pdf] Attachment 3 CCO Memo [pdf] Attachment 3 CCO Memo [doc] Attachment 4 [pdf] Attachment 4 [doc] Attachment 5[pdf] |
CPD 05-13 | Effects of Assembly Bill 574, Recycled Concrete [pdf] | 12/29/2005 | |
CPD 05-10 | Performance Graded Paving Asphalt [pdf] | 11/10//2005 | Attachment 1 [pdf] Attachment 2 [pdf] Attachment 3 [pdf] Attachment 4 [pdf] |
CPD 05-4 | Rescind CPD 03-8 (Reinforcing Steel Shortage) [pdf] | 04/27/2005 | |
CPD 04-6 | Application of the Tunnel Safety Orders [pdf] | 05/10/2004 | Attachment 1 [pdf] |
CPD 02-3 | Damage Claim Standard Special Provisions (SSP) Revision [pdf] | 8/23/2002 | |
CPD 01-14 | Quality of Traffic Control Devices [pdf] | 11/29/2001 | |
CPD 01-11 | Hoisting Operations near Public Traffic and Pedestrians [pdf] | 9/17/2001 | Attachment 1 [pdf] Attachment 2 [pdf] |
CPD 01-04 | Respirator Work during Rubberized Asphalt Concrete (RAC) and Performance Bond Asphalt (PBA) Paving [pdf] | 7/3/2001 | - |
CPD 01-02 | Industrial Work Order 16 and Assembly Bill 60 [pdf] | 2/28/2001 | - |
CPD 00-11 | Overtime Policy for Construction Employees [pdf] | 9/27/2000 | General Guidelines [pdf] |
CPD 00-3 | Caltrans Test 360 - Surface Abrasion [pdf] | 5/11/00 | sample CCO memo[pdf] sample CCO[pdf] |
CPD 99-2 | Compaction Requirements on Shoulders with Rumble Strips [pdf] | 11/22/99 | sample CCO memo [pdf] sample CCO [pdf] FAQs |